May 2003 - Posts

  • 261) Squires Tavern work party

    261)   Squires Tavern work party - May 31, 2003
                     Walt Landgraf is assisted by Fazal Amin and Bill Fletcher (students in the 10th grade at Regional High School #7).  They  vacuum, wash and wax  floors at the Squires Tavern.  They also dust and complete some general cleanup in preparation for a couple of special events at the Tavern coming up over the next several weeks.  The place looks great!

  • 260) Squires Tavern work party

    260)   Squires Tavern work party - May 23, 2003
                     Walt investigates some wiring circuits for planned renovation work.  Charlie removes old tape from the stairway.  Dave continues with the upstairs hallway conversion- today he is taping sheet rock.

  • 259) Squires Tavern work party

    259)   Squires Tavern work party - May 14, 2003
                     Dave and Charlie continue to work on the upstairs hallway conversion, installing some wood moldings where the two ceiling levels meet.  Walt and Ted install one of the first new lighting fixtures. 

    Ted Bachman (at right) and Walt Landgraf install one of the first period lighting reproductions at the Squires Tavern.