March 2004 - Posts

  • 271) Squires Tavern contractor work

    271)   Squires Tavern contractor work - March 25, 2004
                     Plaster contractor Eugene Zordan and Sons arrive to start the second phase of plastering walls and ceilings.  Sections of wall and some areas of ceiling are done in the front parlor and north bedroom downstairs and in the ballroom and two small north bedrooms upstairs.  Prior to the start of plastering, contractor Ed Kostak completed trim work and the installation of the a doorway door into the front parlor tap room.    


    Plaster contractor Gene Zordan prepares a wall in the front parlor for plastering.