312) Work starts on woodshed floor at the Squire's Tavern

312)   Work starts on woodshed floor at the Squire's Tavern - May 2, 2007
                 Volunteer workers begin work on the woodshed floor at the Tavern.  One section of the woodshed already has a board floor and we want to build a similar floor in the second section.  The initial work involves digging out material and leveling up the dirt floor so that the floor joists to be installed are at the same height as the existing floor.


Photo above - Volunteers Mike Ream (at right) and Dave Ravasio (in shadows) level up the dirt floor in the second section of the Tavern woodshed.

Published May 02 2007, 09:20 AM by Paul
Filed under: ,

Comments

 

rimonabantexcellence site title said:

Pingback from  rimonabantexcellence site title

June 12, 2013 8:08 AM
 

rimonabantexcellence site title said:

Pingback from  rimonabantexcellence site title

June 12, 2013 3:28 PM

Leave a Comment

(required)  
(optional)
(required)  
Add
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2017 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems