  • 271) Squires Tavern contractor work

    271) Squires Tavern contractor work - March 25, 2004 Plaster contractor Eugene Zordan and Sons arrive to start the second phase of plastering walls and ceilings. Sections of wall and some areas of ceiling are done in the front parlor and north bedroom downstairs and in the ballroom and two small north...
    Posted to Work Log (Weblog) by Paul on 03-25-2004
  • 267) Squires Tavern contractor work

    267) Squires Tavern contractor work - August 11 and 12, 2003 Morse Electric and H&H Heating complete the installation of air conditioning at the Squires Tavern. This represents the first time that the Historical Society collection benefits from improved climate controls and will allow us to better...
    Posted to Work Log (Weblog) by Paul on 08-12-2003
  • 265) Plaster Contractor visit

    265) Plaster Contractor visit - August 5, 2003 Walt and Linne Landgraf spend a good part of the day with plaster contractor Eugene Zordan inspecting the many areas that will need finish plaster work at the Tavern. Eugene also points out the preparation work that Historical Society volunteers can accomplish...
    Posted to Work Log (Weblog) by Paul on 08-05-2003
  • 253) Squires Tavern floors are sanded

    253) Squires Tavern floors are sanded - February 19, 2003 Workers from Farmington Valley Hardwood Floors sand floors in the back office and bathroom and apply a polyurethane finish. Hardwood floor in the back office room is sanded.
    Posted to Work Log (Weblog) by Paul on 02-19-2003
  • 237) Contractor work

    237) Contractor work - Week ending December 16, 2002 H&H Heating has completed the first phase of the heating system upgrade. Cold air returns and grates are all installed. We now have heat to all areas of the first floor of the building.
    Posted to Work Log (Weblog) by Paul on 12-16-2002
  • 233) Contractor work

    233) Contractor work - Week ending November 16, 2002 H&H Heating has made a lot of progress on the heating system- three air handlers are working, the furnace is rewired, the computer control is installed and three thermostats are operating. Hot air supply to several rooms is on-line and much progress...
    Posted to Work Log (Weblog) by Paul on 11-16-2002
Page 3 of 7 (66 items) < Previous 1 2 3 4 5 Next > ... Last »
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2020 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems