in

Browse by Tags

  • 290) Contractor work

    290) Contractor work - January 9, 2006 Farmington Valley Hardwood Floor workers are almost finished sanding the floor in the Hitchcock Room on the second floor of the Tavern after having completed the floor sanding in the ballroom. The floors look great!
    Posted to Work Log (Weblog) by Paul on 01-09-2006
  • 288) Contractor work

    288) Contractor work - December 15, 2005 Morse Electric has been working on a number of lighting projects at the Tavern over the last two weeks, including outdoor lighting and lighting fixtures and outlets in several rooms on the second floor.
    Posted to Work Log (Weblog) by Paul on 12-15-2005
  • 280) Liquor keep

    280) Liquor keep - April 27, 2005 Carpenter Ed Kostak continues work on constructing the liquor keep in the front parlor. This is an important addition to the room and reflects the first 30 some years of the building's history as a tavern. Work on the liquor keep, located in the front parlor of the...
    Posted to Work Log (Weblog) by Paul on 04-27-2005
  • 273) Squires Tavern contractor work

    273) Squires Tavern contractor work - first two weeks in April, 2004 Painting contractor Peter Webster works on interior painting at the Tavern, including the front parlor, ballroom, south bedroom and front kitchen. Ceilings, window sash and trim are prepped and painted. Looking good! Leon Daigle, an...
    Posted to Work Log (Weblog) by Paul on 04-14-2004
  • 272) Squires Tavern contractor and volunteer work

    272) Squires Tavern contractor and volunteer work - April 7, 2004 Contractor Ed Kostak hangs an interior door on the first floor stairway. Volunteer Dave Ravasio continues painting stairway walls and upstairs hall Contractor Ed Kostak planes an interior door to size.
    Posted to Work Log (Weblog) by Paul on 04-07-2004
  • 271) Squires Tavern contractor work

    271) Squires Tavern contractor work - March 25, 2004 Plaster contractor Eugene Zordan and Sons arrive to start the second phase of plastering walls and ceilings. Sections of wall and some areas of ceiling are done in the front parlor and north bedroom downstairs and in the ballroom and two small north...
    Posted to Work Log (Weblog) by Paul on 03-25-2004
Page 3 of 9 (84 items) < Previous 1 2 3 4 5 Next > ... Last »
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2017 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems