  • 232) Contractor work

    232) Contractor work - Week ending November 9, 2002 Walt has spent hours in preparation work with contractors and this week all the efforts are coming together. H&H Heating starts work on the heating system, including duct work and air handler installations. Morse Electric has installed wiring for...
    Posted to Work Log (Weblog) by Paul on 11-09-2002
  • 226) Contractor work

    226) Contractor work - October 15, 2002 Work starts on the new septic system for the Squires Tavern which is being installed south of the building.
    Posted to Work Log (Weblog) by Paul on 10-15-2002
  • 225) Contractor work

    225) Contractor work - Week ending October 12, 2002 Contractor Ed Kostak and Son has completed installation of a door in the back office area (this door will make the office area more accessible. This doorway was present during the Ullmann family occupation but later removed during State ownership. Ed...
    Posted to Work Log (Weblog) by Paul on 10-12-2002
  • 207) Plaster work starts!

    207) Plaster work starts! - July 17, 2002 Over the past several days, plaster contractor Eugene Zordan and Sons have moved in all their supplies. They have hung the blueboard and have taped the joints. Today they have continued prep work and have started to plaster- adding the first of two plaster coats...
    Posted to Work Log (Weblog) by Paul on 07-17-2002
  • 205) Squires Tavern contractor work

    205) Squires Tavern contractor work - week ending July 13, 2002 Electrical contractor Bob Morse has completed the wiring necessary before the plaster work is started. Carpenter Ed Kostak and son have finished trim work in the back parlor and have enlarged the exterior door opening to comply with handicapped...
    Posted to Work Log (Weblog) by Paul on 07-13-2002
  • 204) Squires Tavern contractor work

    204) Squires Tavern contractor work - week ending June 29, 2002 Plumbing contractor Clayton Webb has moved the sink to the new kitchen location. He has also removed a radiator and installed a hot water control valve and a hose connection in the basement. Electrical contractor Bob Morse has finished the...
    Posted to Work Log (Weblog) by Paul on 06-29-2002
Page 5 of 9 (84 items) « First ... < Previous 3 4 5 6 7 Next > ... Last »
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2017 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems