  • 140) Squires Tavern work party

    140) Squires Tavern work party - January 9, 2002 Volunteers burn the brush pile that has accumulated from clearing the back yard over the past couple of months. Work was also done in the south downstairs bedroom with the removal of a sheetrock interior wall. More work was done in the "stencil closet"...
    Posted to Work Log (Weblog) by Paul on 01-09-2002
  • 115) Squires Tavern work party

    115) Squires Tavern work party - November 7, 2001 Volunteer workers removed modern ceiling in two downstairs rooms: the back room (present day kitchen) and the "front kitchen". Earlier in the week: Walt and Dave worked with Eugene Allen to hook up two sets of drainage pipes to the dry well...
    Posted to Work Log (Weblog) by Paul on 11-07-2001
  • 20) FIRST WORK DAY! - Water damage repairs begin

    20) FIRST WORK DAY! - Water damage repairs begin - December 4, 2000 Contractor Ed Kostak and his son start work on exterior areas of the Squires Tavern that are being damaged by water. The first priority is a section of the east wall which has extensive rot to the clapboards, sheathing, studs and some...
    Posted to Work Log (Weblog) by Paul on 12-04-2000
Page 1 of 1 (5 items)
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2017 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems