  • 52) Work party

    52) Work party - May 9, 2001 Four volunteers put in a couple of hours at various jobs at the Squires Tavern, including more clean-up tasks inside, some brush cutting outside and removing grass from the stone walk leading to the north and west doors.
    Posted to Work Log (Weblog) by Paul on 05-09-2001
  • 49) Work party

    49) Work party - May 6, 2001 Six energetic volunteers work on cleaning up the building. Left over building materials are stored away for future use, junk and various other items belonging to the State DEP are removed and every room in the building is vacuumed. Two photos from the work day are shown below...
    Posted to Work Log (Weblog) by Paul on 05-06-2001
  • 27) Removed junk from carriage shed and yard

    27) Removed junk from carriage shed and yard - December 19, 2000 Walt Landgraf and Project Green workers clean out the carriage shed and the yard and dispose of the trash and abandoned items not worth saving.
    Posted to Work Log (Weblog) by Paul on 12-19-2000
  • 24) Removed junk from house

    24) Removed junk from house - December 11, 2000 Walt Landgraf and Project Green workers cleaned out more items from the house including the old kitchen range and the old unused furnace that was in the basement.
    Posted to Work Log (Weblog) by Paul on 12-11-2000
  • 21) Cleanup of debris, also permits completed

    21) Cleanup of debris, also permits completed - December 5, 2000 Walt Landgraf and a group from Project Green of the Connecticut Corrections Department remove some junk (abandoned furniture and debris) left by former occupants in several of the rooms inside the Squires Tavern. Repairs to the water damaged...
    Posted to Work Log (Weblog) by Paul on 12-05-2000
  • 20) FIRST WORK DAY! - Water damage repairs begin

    20) FIRST WORK DAY! - Water damage repairs begin - December 4, 2000 Contractor Ed Kostak and his son start work on exterior areas of the Squires Tavern that are being damaged by water. The first priority is a section of the east wall which has extensive rot to the clapboards, sheathing, studs and some...
    Posted to Work Log (Weblog) by Paul on 12-04-2000
  • 10) Weeds and brush cut

    10) Weeds and brush cut - August 27, 2000 Volunteer Walt Landgraf cuts weeds and brush from around the foundation exterior of the building (1 hour).
    Posted to Work Log (Weblog) by Paul on 08-27-2000
Page 19 of 19 (189 items) « First ... < Previous 15 16 17 18 19
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2017 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems