in

Browse by Tags

  • 279) Volunteer work party

    279) Volunteer work party - April 6, 2005 Volunteers move three 8" x 8" x 10" pieces of black locust to the wood shed to dry out. They will be treated later with preservative and used as the sills for a small building that will house a informational kiosk and cover the exterior air conditioning...
    Posted to Work Log (Weblog) by Paul on 04-06-2005
  • 277) Stenciling the walls in the front parlor

    277) Stenciling the walls in the front parlor - September 29, 2004 Volunteers Linne Landgraf and Sharon Lynes continue to work on the wall stencils in the front parlor of the Squire's Tavern. Throughout the summer a lot of research and planning has been done on the stencil patterns and layout. The...
    Posted to Work Log (Weblog) by Paul on 09-29-2004
  • 276) Painting, storage cleanup

    276) Painting, storage cleanup - May 5, 2004 Volunteers Walt, Ted, Doug, Dave and Charlie clean out scrap lumber from the overhead storage in the wood shed. Dave also completed interior wall painting on the second floor stair well. Leon Daigle (employee of painting contractor Peter Webster) has almost...
    Posted to Work Log (Weblog) by Paul on 05-05-2004
  • 270) Squires Tavern work party

    270) Squires Tavern work party - February, 2004 Volunteers including Walt Landgraf, Dave Ravasio, Charlie Lynes and Ted Bachman prepare walls, cover floors, etc all in preparation for the second round of plastering on interior walls and ceilings.
    Posted to Work Log (Weblog) by Paul on 02-25-2004
  • 269) Squires Tavern work party

    269) Squires Tavern work party - January 14, 2004 Dave Ravasio removes lathe and plaster to expose an area where a door will be built leading into the liquor keep. The door is a feature that was very likely present during the early years of the Tavern and one that will be recreated now. Charlie Lynes...
    Posted to Work Log (Weblog) by Paul on 01-14-2004
  • 268) Squires Tavern work party

    268) Squires Tavern work party - August 13, 2003 Dave Ravasio and Charlie Lynes continue preparations for plastering in the two small rooms on the north end of the second floor.
    Posted to Work Log (Weblog) by Paul on 08-13-2003
Page 5 of 19 (189 items) « First ... < Previous 3 4 5 6 7 Next > ... Last »
Terms Of Service | Privacy Policy
All Copy and Images Copyright © 2017 Barkhamsted Historical Society All Rights Reserved.
Powered by Community Server (Non-Commercial Edition), by Telligent Systems